+7 (727) 263-62-43
KZ RU EN

Shalkar–Beyneu railway

Construction of the Shalkar — Beyneu railway line, Shalkar — Beyneu section, Tassay, Shukyr and Baikadam stations

An electric interlocking post for 20–30 switches combined with a passenger service point, a service and utility building, water supply, sewerage, electrical installation, heating and gas supply at Tassay station, checkpoint, chlorination house, exploration and production wells No. 1 and No. 2 for utility and drinking water supply (300 m), external water supply networks V1 and V2, external sewerage networks K1 and K1N, storage ponds, water pumping stations, drinking water tanks, pump houses above wells No. 1 and No. 2, a biological wastewater treatment unit, heating networks, fire-fighting pumping stations, heating chambers, water tanks with an above-ground pavilion, sewage pumping stations of 2.7, 3.6 and 12 m³/h, fire-fighting tanks, evaporation fields, a modular boiler house, diesel fuel tanks and an emergency effluent tank.

About the project

  • Years of work
    2013–2016
  • Customer
    ТОО «АБК-Автодор НС» (АО «НК «Казахстан Темир Жолы»)
  • TOP Ltd LLP
    Contractor

Photo gallery