Projects

Facilities we have built

Since 2003 the company has delivered projects at uranium deposits, mining and processing plants, railways, the Khorgos special economic zone and in civil construction across Kazakhstan.

Zhairem mining and processing plant

Zhairem mining and processing plant

Construction of drinking and process water supply, storm sewerage, heating networks, process pipelines and internal utility networks. Location: Republic of Kazakhstan, Karaganda region, Zhairem mining and processing plan…

2018–2023 ТОО «Имсталькон-Темиртау»
Details
Donskoy mining and processing plant, Khromtau

Donskoy mining and processing plant, Khromtau

Installation of steel troughs, lined and rubber-lined pipelines and shut-off and control valves.

2022–2023 ТОО «BI-Industrial»
Details
Tyre plant, Saran

Tyre plant, Saran

Installation of frame and platform metal structures, cladding, irrigation pipes and cooling tower equipment, drilling of wells and installation of supports, installation of process pipelines, anti-corrosion protection an…

2022–2023 ТОО «Имсталькон-Темиртау»
Details
Raigorodok deposit

Raigorodok deposit

Construction of trunk process slurry pipelines.

2022–2023 ТОО «ЦЕНТРПРОМСТРОЙ»
Details
Slurry pipelines, Zholymbet mine

Slurry pipelines, Zholymbet mine

Construction of trunk slurry pipelines 11,000 metres long. Location: Republic of Kazakhstan, Akmola region, Zholymbet settlement, Zholymbet mine.

2021
Details
Zholymbet plant modernization

Zholymbet plant modernization

Construction of trunk slurry pipelines 355–400 mm in diameter and 11,000 metres long.

2021–2022 ТОО «AAEngineering Group»
Details
Khorgos SEZ warehouses

Khorgos SEZ warehouses

Internal engineering systems and a boiler house (supply and installation), internal and external power networks, landscaping, asphalting, supply and installation of a fence and slabs.

2019 ТОО «КИФ Веэрхаусис» в лице ООО «Проект-Девелопмент»
Details
Khorgos — Eastern Gate SEZ

Khorgos — Eastern Gate SEZ

A second-lift pumping station, checkpoint, external power networks, on-site water supply and sewerage networks, chlorination house, drilling of 2 exploration wells of 300 m and 10 water intake wells of 250 m, 6 fire-figh…

2014–2016 ТОО «АБК-Автодор НС» (АО «НК «Казахстан Темир Жолы»)
Details
Shalkar–Beyneu railway

Shalkar–Beyneu railway

An electric interlocking post for 20–30 switches combined with a passenger service point, a service and utility building, water supply, sewerage, electrical installation, heating and gas supply at Tassay station, checkpo…

2013–2016 ТОО «АБК-Автодор НС» (АО «НК «Казахстан Темир Жолы»)
Details
Zhetygen–Korgas railway

Zhetygen–Korgas railway

Construction of service and technical buildings and structures at Altynkol station: external water supply networks V1 and V2, including a crossing under railway tracks, external sewerage networks K1 and K1N, heating netw…

2011–2012 Консорциум ТОО «АБК Курылыс-1», ТОО «АБК Инжиниринг», АО «Промтехмонтаж», ТОО «Регион Строй Консалтинг», ТОО «Аурика» (АО «НК «Казахстан Темир Жолы»)
Details
Ski sports health and fitness complex, Almaty

Ski sports health and fitness complex, Almaty

South track of 2.5 km, north track of 5 km, a sports campus for 300 people, 630/10/0.4 kV transformer substation, a stadium with stands, a tunnel, asphalting and tree planting.

2014–2015 КГУ «Управление строительства города Алматы»
Details
Refinery plant, Astana

Refinery plant, Astana

Pile driving, production building, water supply pumping station, checkpoint, tanks, canopy over the car park, boiler house, inspection pit, external water supply and sewerage networks, storm sewerage, external 10 kV powe…

2012–2013 АО НК «Тау-Кен Алтын»
Details
Railways training centre, Astana

Railways training centre, Astana

Pile driving, a 300-bed hotel, administrative and utility building, training building, a 150-seat canteen, transformer substation, vertical planning, water supply V1, domestic sewerage K1, storm sewerage K2, 10 kV and 0.…

2012 АО «НК «Казахстан Темир Жолы»
Details
Semizbay deposit

Semizbay deposit

Pregnant solution workshop, process maps for production and barren solutions, on-site process communications, process pumping station, decontamination point, local treatment facilities, sulphuric acid warehouse, first-ai…

2007–2009 ТОО «Семизбай-U» (АО «НАК «Казатомпром»)
Details
Budyonovskoye deposit

Budyonovskoye deposit

Process pumping station, sand settlers for production and barren solutions, on-site and off-site process communications, sulphuric acid warehouse with a pumping station, overpass, first-aid point, administrative and util…

2010–2011 АО «СП «Акбастау» (АО «НАК «Казатомпром»)
Details
Khorasan-2 deposit

Khorasan-2 deposit

Ammonium nitrate warehouse, solution processing building, refining workshop, physico-chemical laboratory, boiler house, 10 kV switchgear, first-aid point, drinking water tanks and pump houses, solid waste site, septic ta…

2008–2010 ТОО «Байкен-U» (АО «НАК «Казатомпром»)
Details
Western Mynkuduk deposit

Western Mynkuduk deposit

Road, buildings and structures, a workshop for the production of commercial products, external water supply, sewerage, heating and power networks, equipment installation and a rotation camp for 192 people.

2006–2008 ТОО «АППАК» (АО «НАК «Казатомпром»)
Details
Kyzyltu deposit

Kyzyltu deposit

Tree felling, preparatory works and earthworks.

2010 ТОО «Кызылту» (АО «НАК «Казатомпром»)
Details